Pages

Showing posts with label public transport. Show all posts
Showing posts with label public transport. Show all posts

Tuesday, 16 November 2010

South Kensington station needs more trains



I have visited several railway stations during my campaign. Its a great opportunity to meet and hear from locals on their way to work and to highlight the many opportunities to improve our public transport system.


At South Kensington, accompanied by my partner Sally, daughter Georgia and volunteers, we had a pleasant morning handing out information to commuters.

This busy station is now unstaffed, and the "hole in the wall" vending stall - along with all the facilities - toilet, office and kiosk - are permanently closed. It would be great if you get a coffee, a croissant and a newspaper on your way to work.

There are too few trains stopping at South Kensington, even during busy commuting times. This means you need to plan your trip to avoid a lengthy wait, rather than just go to the station and get on train within a few minutes, as you can in London, Paris, Milan, Rome and Zurich.  

There was a better service at South Kensington 80 years ago. In 1929 Melbourne's population was less than 1 million, and there were 16 trains on weekdays between 6:54am and 9:03am - an average of one every 8 minutes

In 2010 (with our population over 4 million) there are just 10 trains over the same period - an average of one every 12.7 minutes.

After 9:05am there are trains every 20 minutes.

This is not good enough. In Parliament, I would work for a better public transport service.

There were also many cyclists riding past the station using Childers St as a transit route, yet there is no bike line or route markings for what is obviously a popular bike path. I would work to make Melbourne a more bike-friendly city.


Afterwards, breakfast in Bellair Street, Kensington.


My campaign car - a Blade Electron Mark V electric vehicle

Links

Tuesday, 9 November 2010

Giving taxi drivers a fare go


Taxi drivers protest outside Flinders Street Station

They form an integral part of our public transport workforce, yet their working conditions, safety and welfare are largely ignored. They work in a multi-million dollar industry, but regularly take home less than the minimum wage. Welcome to the world of the Melbourne taxi driver.
The taxi industry has been in the spotlight in recent years, not least for the 2008 Flinders Street station protest when, following a violent attack on one of their own, drivers stopped work and removed their shirts to bring attention to their plight. As a result, driver safety was improved with the introduction of security screens and pre-paid fares.
But the story doesn’t end there. Recently, I met with a large number of taxi drivers to gain a first-hand account of life as a Melbourne cabbie. The picture is bleak.
Drivers often work 16-hour days and, depending on demand, can take home less than $7 per hour. There’s no holiday pay or sick leave. They fund their own uniforms, clean up after drunken patrons, and pay the fare when a passenger does a runner.
Perhaps the most critical issue, though, is that of insurance. Third-party insurance is not mandatory for taxi cabs, and is expensive because mainstream insurance providers refuse to insure taxis. Many taxis operate uninsured and if a driver causes an accident with another vehicle, he or she is personally responsible for the damage. Bankruptcy beckons.
Melbourne’s drivers have little power in the taxi game. They sign unregulated bailment agreements with operators, with a recommended 50-50 fare split. Thus they become independent contractors, looking out for themselves in an industry where taxi licences change hands for up to half a million dollars, but little filters down to the driver.
Taxis are an essential part of Melbourne’s public transport system and taxi drivers deserve fair treatment, just like bus, train and tram drivers.
The taxi industry needs reform to ensure a more equitable distribution of income and to ensure safe and reasonable working conditions for drivers. It’s only ‘fare’.

Friday, 5 November 2010

Let’s do public transport properly

Waiting for a better public transport system - PTUA photograph

The seat of Melbourne is home to some of Victoria’s most critical – and iconic – public transport lines and hubs including Flinders Street Station, Southern Cross Station, the City Loop and Melbourne’s famous tram network.

But even within the Melbourne electorate, the public transport system is running down. At Newmarket station in peak period there were 18 trains to the city in 1929, and today there are 12. At South Kensington there were 16, but today there are 10. That pattern of rundown and neglect is true across the network.

The woeful state of the current system is unacceptable and immediate action is required. We need a public transport system that can respond to a growing population and offer a real alternative to car use.

The Greens have a six point plan to fix public transport:

  1. End the failed privatisation experiment

Under privatisation, costs have dramatically increased, performance is appalling and planning is chaotic. No one is accountable for the system as a whole.

  1. Establish a powerful, accountable Public Transport Authority (PTA)

The Greens will create a publicly accountable PTA modeled on successful agencies like Translink in Vancouver, ZVV in Zurich and Australia’s own Transperth.

  1. Fix urgent problems

Expert task forces will act now to increase capacity, review ticketing, plan for expansion and establish the PTA.

  1. Make public transport safe

Staff all train stations from first train to last, bring back tram conductors, fence rail lines and fix level crossings.

  1. Extend rail and tram systems

Urgently extend the rail line from South Morang to Mernda, and tram routes to East Malvern Station, Doncaster Shoppingtown and Knox City. Double-track key lines, order more trains and make better use of the existing tram fleet.

  1. Introduce ‘Swiss-style’ public transport for regional Victoria

Reform V/Line, order more high-speed trains, devise an integrated rail-bus network connecting regional Victorians to local, inter-regional and metropolitan destinations.

Public transport should be in public hands for the public good. The new Public Transport Authority will have the skills and experience needed to build great public transport. With a new agency, we can cut through the byzantine bureaucratic mess public transport users currently deal with, abolishing:

  • Director of Public Transport and the Public Transport Division of the Department of Transport
  • Transport Ticketing Authority
  • VicTrack
  • Metlink
  • Public Transport Ombudsman
  • Public Transport Customers Charter Consultative Committee

The new PTA aims to be small, smart and transparent. Public transport experts will be recruited from the best-performing agencies around the world, instead of re-assigning staff from the existing, failed bureaucracies. Based on the experience of Perth, Vancouver and Zurich, around 60 staff are required, including a dozen public transport experts. The PTA will hold public board meetings and seek community input into its plans. Public accountability is key.

Victoria has the potential for a world-class public transport system. It’s time to get started.

External Links:

Wednesday, 28 July 2010

Westlink nightmare

The freedom of the open road

So the government has announced its route options for Westlink - its "number one priority project".

Whatever option is chosen, the outlet ("hell mouth" as one resident calls it) will come out south west of JJ Holland Park at Dock Link Road, with further links to Dynon Road and Footscray Road. The government has admitted there will be 60,000 vehicles a day using Westlink. A three lane freeway at peak hour would be expected to deliver about 5,000 vehicles an hour.

The result will be gridlock in Footscray Road and Dynon Road. That means much of the traffic will move up Kensington Road and along Macaulay Road - causing massive traffic jams in Kensington. Each evening the process will be reversed, with cars using Kensington to get back on to Westlink.

When planners were asked about this, they answered that trucks would not be able to get under the railway bridge on Kensington Road. This may be true of some trucks, but not all. It will have no effect on the thousands 0f cars which will constitute the majority of the traffic from Westlink.

The heavy traffic load will also mean gridlock in West Melbourne as cars and trucks try to get to and from the city on every available route.

Westlink is the first stage of the controversial Eddington east-west tunnel. The government said so in its documents sent to Infrastructure Australia, obtained by the Greens under the Freedom of Information Act. The RACV is already calling for completion of the whole tunnel.

The build up in traffic will be used to advocate further tunneling, and the result will be ventilation stacks and outlets across the parkland between Kensington and Fitzroy. We don't want to struggle to win something we thought we'd already won.

There is something decidedly dodgy about the government's figures. The say that Westlink will cost only $3 billion. They told Infrastructure Australia that the shorter version of the tunnel would cost $5.8 billion.

There is no federal funding for this project, because Victoria could show no net economic benefit for the project: we would be spending $3 for every $1 gained. Just what is the economic justification for this white elephant?

We don't want the pollution, the noise, and the traffic of Westlink. The entire route follows an underutilized train line. For a fraction of the cost we could have a proper commuter service.

In an era when climate change is a pressing reality, and when peak oil is rendering the combustion engine too expensive, we should be well past thinking of building more roads for gas-guzzling vehicles.

External links

Tuesday, 22 June 2010

Fixing trains


At Kensington Station talking to commuters

This morning I was at Kensington Station speaking to commuters and watching them trying to climb on to overcrowded trains. They'd often have to wait for the next one. Is this the best we can do?


1929 timetable for the Essendon line

It's a little hard to read in the copy posted above, but the 1929 Victorian Railways timetable for the Essendon line makes interesting reading.

No less than 81 years ago, there were 17 trains stopping at Kensington on the way to the city between 7.00 am and 9.00 am on weekdays. That's an average of a train every 7 minutes or so.

Today, between 7.00 am and 9.00 am there are just 12 trains - an average of a train every 10 minutes.

The population of Melbourne in 1929 was less than 1 million. Today it is more than 4 million.

Our public transport system is infrequent, overcrowded and unreliable.

It doesn’t have to be like this.

Zurich administers its entire public transport system (which moves more people than Melbourne’s) with just 36 staff (I'm not counting actual drivers). In our “Transport Ticketing Authority” alone – whose only job is to hire someone else to run a ticketing system – we have 104 staff.

A single train moves more people than an entire lane of cars driving past in an hour. Public transport can be efficient – to say nothing of the environmental benefits.

In a recent parliamentary inquiry, Greens MP, Greg Barber, found that Melbourne’s rail managers are guilty of “self-congratulation, complacency and strategic misrepresentation”.

The evidence showed that many ‘reasons’ given for public transport failure were simply excuses for poor planning or justifications for the disastrous adventure of privatisation.

1. Unprecedented summer heat

Melbourne has hot summers. We need to plan for them. The hot weather exposed the fact that we have no effective management of our transport maintenance backlog.

2. Over-crowding: the system is the victim of its own success

The government says that rapid patronage growth causes the crowding that delays trains. This is too convenient. Patronage targets were set almost a decade ago, but new trains are only just arriving. The main cause of over-crowding is poor planning.

3. Connex was bad; Metro will be better

Privatisation has been fraught since its inception due to “aggressive” under-bidding by the operators and the government’s acceptance of demands for extra funding.

4. The system is at capacity

It isn't. As the 1929 timetable shows, we ran far more trains 80 years ago.

Fragmented responsibilities created by privatisation, combined with inadequate planning skills, mean inefficient use of existing tracks and poor design of new projects.

Privatisation complicates and confuses planning for today’s growth in rail patronage. How can it possibly deliver high-quality public transport to meet tomorrow’s challenges?

It's time to fix public transport. We need to:
  • end the current franchise arrangements;
  • create a metropolitan public transport authority and bring in managers with a track record of success to deliver a ‘network’ that meets the needs of our city.
We need a public transport service we can all enjoy.

External Links

Saturday, 22 May 2010

Westlink, Schmestlink


Is there somewhere else we can squeeze a freeway?

Amongst the many freeway proposals the Brumby government keeps spruiking, the "number one priority project" is Westlink.

Westlink is a proposed six lane tunnel and freeway joining the Western Ring Road to Docklands. It is currently estimated to cost $5 billion, although that figure is climbing fast - it was just $3.5 billion two years ago.

Documents just obtained under the Freedom of Information Act by Greens MLC Greg Barber show that Federal funding was rejected from this project because Victoria could show no net economic benefit for the project.

There is in fact no overall transport or environmental benefit either. Westlink will in peak hour deliver another 5,000 vehicles an hour - including trucks - into the Docklands area. This is hardly a way of removing congestion.

The proposal will also take money away from public transport - a far more efficient people-mover than any road. A normal road lane carries 700 cars an hour - tops - and in Melbourne each car carries an average of 1.1 people. But a peak our train whisks by in seconds with just as many people, and you can have several of them in an hour. A freeway lane in good conditions can carry 1500 - 2000 cars an hour. That's two trains. The proposed route of Westlink substantially follows rail lines all the way. For a fraction of the cost of Westlink, we could actually deliver an efficient rail service along that line.

And it's not as though there are not good proposals for removing the trucks from inner Melbourne. When the containers are unloaded from ships, they are stacked on the wharf and then loaded onto trucks which wait in queues before moving off. Every truck that has to carry a container must converge on the Port of Melbourne, and that is what causes the congestion.

Move the containers by rail from the Port of Melbourne to freight terminals on the outskirts of Melbourne at Laverton, Melton, Kalkallo and Dandenong, and let the trucks use these hubs to pick up the containers. That would bring considerable relief to inner Melbourne, and overall greater efficiency - at present many trucks queue for hours in the one big terminal.

Westlink is also the first stage in the Eddington East/West Tunnel proposal. We thought we'd won that struggle, but the documents obtained under FOI show that the government is quietly pressing ahead with it. In their submission to Infrastructure Australia in October 2008, the Victorian government said:
"following further expansion of the project [Westlink] there will be an east west link north of the CBD between the eastern freeway and the western ring road"

Compare this with the public statements of Minister Pallas at a joint press conference with the Premier John Brumby on 9 September 2008:
REPORTER: Is an east-west tunnel now more likely to be west-east tunnel that will start west and work its way back?

PALLAS: Oh, look, once again, that’s an issue of the priorities that government needs to set and we’re going to continue to work through those issues in a considered way.

REPORTER: But that’s a possibility?

PALLAS: Oh, it’s a possibility that it could be built west to east, but certainly the issues that are on the table need to be considered in a substantial way and a considered way. We’re not going to rule anything in or out.

The RACV openly states that Westlink only makes sense if it is part of the East West tunnel.

The East West Tunnel threatens several parks - the proposal had the freeway coming up in Royal Park and Holland Park for example. But it will also be part of the same old 1950s road-building mindset that has got us into this gridlock in the first place.

John Brumby's response to the furore over the stupidity of Westlink was telling. He just doesn't get it. He thought the only alternative to Westlink would be another road - whether on a bridge or bulldozed through suburbs. He is pressing ahead with Westlink despite the lack of any credible economic case. What he doesn't appreciate is that the real, rational alternative to his expensive white elephant is viable public transport.

With peak oil approaching, and with dangerous climate change now looming as a serious worldwide threat, we can no longer afford this kind of dull, old thinking. Smarter transport solutions are needed - and they are not roads.

As Albert Einstein said:
The world will not evolve past its current state of crisis by using the same thinking that created the situation.


External Links

Tuesday, 27 April 2010

Hoddle Highway?



Hoddle Street beside Collingwood Town Hall
- just the other side of the Town Hall runs the Hurstbridge/Epping rail line
Each morning Hoddle Street is choked with traffic. The government has committed to a $5 million study “to investigate ways to improve the efficiency and reliability of all modes of transport along and across Hoddle Street from Eastern Freeway to just north of the M1 Freeway”.
Although the proposal is to improve "all modes of transport" the study is being conducted by VicRoads. The focus on Hoddle Street, separate from the other major transport routes with which it interrelates, suggests there will be a focus on cars and roads, rather than, for example, trains.
Close examination of the Project Description, which forms part of the Hoddle Street Study Scope document (downloadable from the home page of the Study) shows that the real purpose of this study is nothing other than roadworks. It is an engineering study to best carry out "grade separation" (ie flyovers and tunnels) along Hoddle Street:
Grade separating some of these junctions has the potential to improve the operation of Melbourne's central road system for cars, trams, buses and commercial vehicles.
The Government will allocate $5 million to commence engineering investigations to determine the feasibility of grade separating key junctions on Hoddle Street. A key element in these investigations will be to assess how disruption to traffic could best bee minimised during any construction works.
Rail will not be considered. Nor any other more imaginative options. It's just lots of road building. Disruption "to traffic" will be considered, but not to residents or parklands.
Each morning at peak hour Hoddle Street carries in total some 8000 vehicles. There is an average of 1.1 people per vehicle. Most of the traffic is heading into the city.
The best capacity roads can achieve is about 700 cars per hour per lane. Hoddle Street is already very close to that level of use, so the benefit from expensive grade separation is necessarily minimal.
Let's take a look at how people move in the area during the mornings at present:
People movement in Hoddle Street area
In addition to the 8000 cars along Hoddle Street, there are about 12,000 cars going along the cross streets. Along the cross streets, buses move about 4500 people at present. Trams move about 4200 people.
But the big people mover is rail. Trains in the vicinity of Hoddle Street move 80,000 people each morning. Whilst the cars sit in their traffic jams, fully loaded trains whisk by.
The train system has a lot of room for more efficiency - more frequent trains would get many more people into the city in less time. Those who have to travel by car would do so more easily.
Hoddle Street is crowded because cars are such an inefficient way to move people in numbers. The billions of dollars in upgrading Hoddle Street would be better spent upgrading the rail system.
And that's even before we've talked about peak oil or carbon emissions - or bicycles.
Residents certainly don't want this Hoddle Highway white elephant. It will mean using Yarra Park as a construction site for years, and major disruption to the local area. The Greens held a public meeting in the East Melbourne Library last week, with numbers overflowing the venue. The opposition was unanimous, well-informed and passionate.
We want imaginative solutions that deal with the real transport needs of Melbourne. The Greens' People Plan is a great start.
External Links